I’ve just had 16 panels, inverter and two 5.3kw batteries installed. Unfortunately Octopus cannot read my meter, I’ve submitted my certs to them, just waiting on my phase2 smart meter to be sorted so I can get on Flux until mid October. I’m in the middle of having a log burner put in and will be looking at a electric combi boiler to be fitted soonish as I don’t want gas in the house. I live in a two bed bungalow, just me and I’m thinking of a 120ltr elec combi, which will feed 5 rads, if I ever need them.
In 19 days I’ve exported 359kWh and got nowt back, wish they’d hurry up, I was hoping I’d be up and running in Feb this year but First4Solar went into liquidation and I lost my deposit.